Yield excursions, traced to the tool. Lots, tools and metrology together.
We read the wafer map and the tool history together, so an engineer has a disposition within the shift.
Two kinds of evidence.
A yield excursion shows up as a pattern on the wafer and as a window in tool history. The two live in different systems and are read by different people.
An edge ring already narrows the cause to a handful of steps. We treat the map as data the system can reason about, and link each finding to its lots and tools.
- Classifiedwafer maps · edge-ring signature1.2s
- Walkedgenealogy · 312 lots, 41 steps2.4s
- Delegatedtool-state check · 3 chambers3.1s
- Comparedincident 2291 · same signature0.7s
- Proposedhold 38 lots · for approval0.3s
The loss tracks chamber B on ETCH-07 after the 14 Oct preventive maintenance. Edge-ring rate is flat on chambers A and C.
From the wafer to the tool.
Wafer map with defect signature. Wafer map of W07 in lot L-2417: 352 dies, 90 fail, yield 74.4%. 78 failing dies form a edge ring signature; the classifier reads edge ring at 0.86 and links the wafer to investigation INV-20418 and a hold under SOP-QA-001.
Fab 1 overview with agent fleet and twin. Overview of Fab 1: 6 bays and 13 tools (9 running, 1 setup, 1 maintenance, 2 idle), lot carriers on the central aisle, a fleet of 5 agents and a digital twin of the same floor. Metrology tool MET-03 measured lot L-2417; SPC tripped on etch depth from RIE-02. Plant Sentinel flagged it, the RCA Investigator opened INV-20418, the lot is on hold, and the digital twin shows RIE-02's etch rate drifting 3.1% above its model. Agent statuses: Plant Sentinel: watching · 1 open trip; RCA Investigator: INV-20418 · 4 hypotheses proposed, 9 evidence links; Process Engineer: drafting a PM-interval change · pending approval; Wiki Librarian: linked INV-20418 on the RIE-02 page; Supply Planner: focus rings for ICP etch: 2 on hand, 21-day lead.
Die floorplan, isometric. Isometric floorplan of a logic test die: an IO ring of pads around Logic cluster (standard-cell rows), SRAM A (4 Mb · bit-cell array), SRAM B (where Bin 7 fails land · 62%), Analog / SerDes (mixed-signal), PLL (clock generation), Interconnect (global routing band). SRAM B is highlighted: the wafer's signature fails land there. Geometry is illustrative.