Engineering decisions with the evidence attached. Every source in one case.
We build systems that read engineering documents the way an engineer does, and cite the page.
Numbers inside documents.
The evidence behind an engineering decision is often a table in a scanned certificate. Simulation results and test reports are rarely read side by side.
Reading those tables reliably, field by field, took most of our effort. A decision built on a misread value is worse than no help.
- Readdrawing P-1180 rev C · 5 characteristics1.8s
- Extractedinspection certificate IC-09121.4s
- Comparedmeasured against nominal ± tol0.5s
- Searchedtest reports, open NCRs, ECO-2211.2s
- Flaggedthickness out of tolerance0.2s
Thickness measures 12.14 mm against 12.00 ± 0.10. The other four characteristics pass. Release needs a concession or a re-measure.
Documents become evidence.
How the Agent Hive wiki is built. A knowledge factory line: SOP PDFs, Tables, Runs · notes, Connected → Draft → Link → Resolve → Type → Approve → Commit → Context. Every item waits at the human approval gate; rejected ones leave the line. So far: 11 ingested, 22 extracted, 7 merged as duplicates, 16 passed approve, 1 rejected, 16 published, 10 served as context. The followed item (page “Late delivery”) is at: Approve · pending.